May 5, 2011 by Eric

Changes in the boiler room

As the undergraduates draw another year to a close, the project made progress this week. The insulation crews have been in and drywall is being installed. The project is slightly behind schedule as the City of Lincoln required and handfull of structural changes to bring the chapter house up to current building and safety codes. However, the project is still on schedule to be completed by August 15. Demolition begins on the 1964 addition on Monday, May 9.

The City required updates of the 1931 roofing structure. To accommodate the changes, the project was either going to have to remove and rebuild the entire roof to address venting issues or fill the roof structure with spray foam insulation. The second option was selected, even though it was a cost overrun of several thousand dollars, it was significant less than rebuilding the entire roof.

Insulation is also being installed on the second and third floor exterior and interior walls. The interior insulation will help keep the sound down between rooms, while the exterior insulation (including the spray-foam in the roof) will save the chapter funds on utilities for years to come – not to mention, make our building a little greener.

Recessed lighting is being used throughout the entire project. As these lights are recessed into the ceiling, it will be less likely they will be damaged and there will be no globes to break. For fire safety, the City required fire-proof covers to be installed around each fixture. These arrived and are being installed this week.

The mechanical contractor has stripped the boiler room of all the old pipes, tanks and pumps. The current boiler (installed in 1998) will be reused for the new fintube heating and air conditioning system using hot and chilled water. The old system used steam heat for the 1931 building and hot water for the 1964 addition. Switching to hot water for the entire system means it will cost significantly less to heat the chapter house, in addition to being simpler to operate.

Drywall has gone up in 3rd old. 

Interior and exterior insulation is being installed. This is a photo of standing in one of room 300’s bedrooms (approximate location is old 301) looking into the new room 301 (old 302). The interior insulation will help cut down on the sound transmission between rooms.

Spray foam insulation was installed in the attic last week, as required by the building codes. This photo is taken from south wall of the 4th floor looking into the room 401 (formerly known as 4-South).

Fire proof tents were installed around the new recessed light fixtures.

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Related

Posted in 2nd old, 3rd old, 4th floor, building codes, green building, insulation, lighting, mechanical systems |

  • Donation infomation

    Read how to support the project by clicking on the “How to Donate” tab at the top of the screen.
  • Enter your email address to subscribe to this blog and receive notifications of new posts by email.

    Join 40 other subscribers
  • This Old FIJI House archives

    • October 2011 (1)
    • August 2011 (4)
    • July 2011 (4)
    • June 2011 (5)
    • May 2011 (4)
    • April 2011 (4)
    • March 2011 (4)
    • February 2011 (6)
  • Recent Posts

    • The project is complete
    • FIJI is ready for business
    • They day before the fraternity property returns

Create a free website or blog at WordPress.com.

WPThemes.


Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • This Old FIJI House
    • Join 40 other followers
    • Already have a WordPress.com account? Log in now.
    • This Old FIJI House
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Copy shortlink
    • Report this content
    • View post in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...
 

    %d bloggers like this: