Lots of progress this week – with dorm room furniture scheduled to be delivered on Friday, July 15 for the 1931 side. The crews have been busy installing the fire sprinkler system (the item that started this entire project), HVAC equipment, carpet and paint. Based on all known information at this point, the project is scheduled to be ready for the undergraduates to move in on August 15.
Inspections were approved to start finish work on the 1964 addition. Drywall has been hung in the dining room, foyer, 2nd floor ceiling and 3rd floor. Work continues on the bathroom.
The entire building will now enjoy central air. The cooling equipment sits in the corner of the parking lot – where the ‘new’ and ‘old’ houses meet. While this location is not ideal, it is the best solution that could be developed given the multiple factors that needed to be considered (including distance from the mechanical room and costs). We were able to continue to use the boiler that was installed in 1997 for heat.
An individual ‘make-up’ air unit was installed for the kitchen. This will provide both additional heat and air conditioning for this specific area of the chapter house. The guys are going to have some cool cooks. In addition, a new stove and refrigerator are on order for the kitchen.
The new AC has been installed on its pad. While not ideal, this was the best of many not-so-good options.
Make-up air unit for the kitchen. This will provide additional heating and cooling.
The living room has been primed with tinted primer.
The dining room has had drywall hung.
The housemother’s bedroom. Due to changes to the women’s restroom (will now be an ADA complain unisex restroom), the housemother’s bedroom gained much-needed, and I’m sure apprecaited, square footage.
Room 200 (formerly 200 and 201) carpet has been installed. The camera continues not to do the actual colors justice.
Room 302 (formerly 303).
The 1964 addition has a little ways to go — this is taken in the study room of the new 309 (formerly 310 and 311), standing on the south wall — looking to the north.
The poor back lot took a beating and is scheduled to be paved next week. The cement pad at the top of the photo is the location of the new transformer that will be installed next week as well.
I sure hope the girls don’t complain too much about the “ADA complain unisex restroom”.
Dick “Turk” Altrock