With less than a month before the project is scheduled to be complete, the finish crews have moved to the 1964 addition. Drywall has been hung, ceilings are up and bathrooms are ready for tile. It will be a very busy month to meet the August 15 deadline.
Final finishes are in progress in the 1931 building – light fixtures, switches, plugs and plumbing fixtures are being installed. The house will have a new power service this week – which will allow us to fire-up the air conditioner for the first time to cool the property down.
In addition, the first shipment of dorm room furniture has arrived. Each sleeping room will have solid oak bunk beds, a dresser and wardrobe. The study rooms will have a desk. Living room furniture was ordered this week and will arrive August 16.
Stall dividers being installed in the 2nd floor bathroom of the 1931 building.
Drywall is up in the 1964 addition — this is the study area for 308 (formerly rooms 308 and 309).
2nd floor bathroom in the 1964 addition — tile work will begin next week.
Tile work in the housemother’s bathroom — new floor and fixtures are being installed.