Thank you Graduate Brothers — the new donor wall has been installed in the living room.

Nearly eight months to the day that the first wall came down, the chapter house project is done. Lambda Nu is the one of the safest and most modern fraternity houses at the University of Nebraska.  A few last-minute projects included replacing the patio area directly in front of the 1931 building and adding a railing to the 1964 addition to bring the building into current safety codes.  A new front door was installed last week and landscaping will go in on Monday.

The house corporation is still accepting donations (the final construction bill is coming in at $1.6 million).  Visit the How to Donate section for information on donating.

The completed living room — looking into the study room. The furnishing include new leather couches and chairs, side tables and art work (historical photos from Lambda Nu’s archives).  The House Corporation was able to save the coffee table, piano, grandfather clock and library table.

Study room at the back of the living room.  The conference table was acquired a few years ago and is heavily used resource in the chapter house.  The chapter awards line the walls and the 1936 pledge class photo hangs over the fire-place.

The dining room features new chandeliers and is painted in a darker tan with a green hue.  Lambda Nu’s former homes are featured on the walls. The original dining room tables were refinished for years of future service.

The room formerly known as B2 has been made into the Andersen Study Center and features a large study tabel and desks for students to complete homework.  The old door that use to exit to the parking lot was blocked and filled in.

A ‘small’ television was added in the basement for brothers to gather and watch the big game on the big screen.

The back of the old diamond room now features of pool table, complete with purple felt.  Several pool tournaments have already been held and this area is one of the most popular gathering places in the chapter house.

The hallways now feature composites. This hallway is 2nd old.

A new railing has been added to the balcony to bring it to current building codes.  In addition, the floor was pitched and sealed to prevent leaking in the foyer below.

Read Full Post »

65 new mattresses arrived today

Tomorrow, Tuesday, August 16 is a big day – all the fraternity property will be moved back from storage. Due to the extent of the renovation, the chapter had to store its property off-site.  We kept the large round coffee table, grandfather clock, piano, trophy case, library table, conference table, milk machine, Hobart mixer, and freezer – along with all the composites, chapter records, supplies, etc.

Today, a few deliveries were made – including the washers and dryers for second and third floor, 65 mattresses and rest of the dorm furniture (bunk beds, dresser, wardrobes and desk). Tomorrow the new living room furniture and copy/scan/print machine will arrive.

The house corporation also met with the locksmith today — the chapter will be installing a master key system for all interior doors and a card system at all entry points. This should help manage the who has access to the chapter house.

Thank you to all the graduate brothers who have donated to the project.  Our young PhiGams are going to have a safe, modern chapter house to call home during their college years.  If you haven’t donated yet – we can still need your help!  Visit the How to Donate tab for more information.

The living room is ready for furniture — minus the fire door on the right (which will be installed upstairs tomorrow).

The dining room floor was sealed and waxed today. Chandeliers were hung late last week.

The first piece of furniture was brought back to the chapter house last weekend — the grandfather clock. It has been in foster care for the past few years as the exact date of construction was not known.  It is working properly and keeps excellent time.  The small white box to the left is the carbon monoxide detectors that are now required to be approved university housing.

Read Full Post »

With less than a month before the project is scheduled to be complete, the finish crews have moved to the 1964 addition. Drywall has been hung, ceilings are up and bathrooms are ready for tile.  It will be a very busy month to meet the August 15 deadline.

Final finishes are in progress in the 1931 building – light fixtures, switches, plugs and plumbing fixtures are being installed. The house will have a new power service this week – which will allow us to fire-up the air conditioner for the first time to cool the property down.

In addition, the first shipment of dorm room furniture has arrived. Each sleeping room will have solid oak bunk beds, a dresser and wardrobe.  The study rooms will have a desk.  Living room furniture was ordered this week and will arrive August 16.

Stall dividers being installed in the 2nd floor bathroom of the 1931 building.

Drywall is up in the 1964 addition — this is the study area for 308 (formerly rooms 308 and 309).

2nd floor bathroom in the 1964 addition — tile work will begin next week.

Tile work in the housemother’s bathroom — new floor and fixtures are being installed.

Read Full Post »