Electrical and mechanical rough-ins started this week. The plan is to convert the existing boiler (installed in 1997) to hot water (currently hot water and steam) and install new air conditioning equipment. Each room will have their own heating and air conditioning units.
The exterior walls have been furred out to accommodate insulation. This will help with the overall efficiency of the building. There is currently no exterior insulation, other than air space. In addition, this will allow new wiring to be installed.
Asbestos removal continues in the basement.
New floor joists were installed in the bathrooms and the floor is down. Several of the existing floor joists had significant notches (up to ¾ the width of the joist) cut into them to accommodate different plumbing and remodels over the past 80 years. This was not safe to install the new bathroom without taking care of this structural issue.
Finally, a new subfloor was installed on the 4th floor. Several of the old floor boards were very thin or cracked. In addition, this separation was required for fire codes.
Next week, the windows for the old side should start to arrive and be installed. They are being replaced with a double pane insulated window.
The asbestos removal continues – this is the tent set up outside of B2.
Exterior walls are being furred out to accommodate insulation and provide a tight seal between levels.
2nd floor — north side — where the hallway continues to the new side. This will be the future site of a laundry room.
Taken in the new Room 200 — from the educational space looking into the two new sleeping rooms.
The new 3rd Old bathroom — the floors have been replaced. Plumbing should be installed in the next few weeks.
A new subfloor was installed on 4th floor. This is taken on the south wall — right next to the fire escape.