Old side upstairs painted, carpet to be installed

July 7, 2011 by Eric

Refinished dining room tables

The painters have finished 2nd, 3rd, and 4th floors of the 1931 building. The camera is not doing the colors justice – the hallways and individual sleeping rooms are light beige with the study rooms a light brown.  Carpet should be installed next week.

Mechanical and electrical rough-ins continue in the 1964 addition.  Fire sprinklers are being installed in the entire building.

Lincoln Electric System buried the power line last week.  While it is nice to have this line concealed, the downside is the back lot took a beating.  Luckily, as they dug a trench from the pole to the back of the 1931 building, no surprises were found (such as a buried fuel tank).

A new stove and refrigerator has been ordered to replace the 1964 appliances.  The fraternity’s freezer is relatively new and will be reused.

The board was able to contract with Cornhusker State Industries to custom build dorm room furniture (will be installed in the completed rooms next week).  CSI also refinished the dining room tables and a few other wood pieces from the chapter house.  The dining room tables look brand new and are ready for another 50 years of FIJIs celebrating lunch and dinner together.

Room 200 — the study room and sleeping room has been painted.

Room 401 (old 4 south) — the hallway that leads to the main study room. The sleeping rooms  are off to the right. 

The bathroom on the 1931 building — 3rd floor — ready for final finishes.

Mechanical and electrical rough-ins. Photo is taken on 2nd floor — looking west into room 210 (old 212 and cleaning closet).

3rd floor bathroom, 1964 addition — plumbing rough-ins are installed.  Drywall should start soon.

Fire sprinkler rough-ins on the 3rd floor, 1964 addition.

The 1964 appliances have been removed and new ones are on order.  The kitchen layout will remain relatively the same.

The poor back lot has seen better days — LES dug a trench from the pole in the middle of the photo to the back of the 1931 building to install a new power main.

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Related

Posted in 2nd new, 2nd old, 3rd new, 4th floor, carpet, dining room, fire sprinklers, kitchen, paint, plumbing, tile |

  • Donation infomation

    Read how to support the project by clicking on the “How to Donate” tab at the top of the screen.
  • Enter your email address to subscribe to this blog and receive notifications of new posts by email.

    Join 40 other subscribers
  • This Old FIJI House archives

    • October 2011 (1)
    • August 2011 (4)
    • July 2011 (4)
    • June 2011 (5)
    • May 2011 (4)
    • April 2011 (4)
    • March 2011 (4)
    • February 2011 (6)
  • Recent Posts

    • The project is complete
    • FIJI is ready for business
    • They day before the fraternity property returns

Blog at WordPress.com.

WPThemes.


Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Follow Following
    • This Old FIJI House
    • Join 40 other followers
    • Already have a WordPress.com account? Log in now.
    • This Old FIJI House
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Copy shortlink
    • Report this content
    • View post in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...
 

    %d bloggers like this: